- The Yosemite Climber’s Credo: Principles for Responsible Climbing - 09/24/2024
- 2024 Yosemite Facelift - 09/19/2024
- 40th Annual California Coastal Cleanup Day - 09/19/2024
For the First Time, America’s Greatest Cycling Race Will Travel South to North, Beginning in Escondido and Crossing Beaches, Deserts, Mountains, Golden Gate Bridge
LOS ANGELES (February 12, 2013) – Changing direction for the first time in its eight-year history from south to north, America’s largest and most prestigious professional cycling stage race, the 2013 Amgen Tour of California, will bring riders and spectators first-time destinations, unprecedented climbs and demanding sprints on the approximately 750-mile course.
Amgen returns as the title sponsor for the heralded 8-stage race, set for May 12 to 19, 2013. Beginning with a circuit in Escondido, the route will run through 13 official host cities and include a first-time finish at the top of Mount Diablo, the 3,864-foot peak in the San Francisco Bay area. The race’s last stage will begin along the San Francisco Bay and continue across the Golden Gate Bridge, where a rolling traffic break will give cyclists uninterrupted access for the six-minute crossing.
Two new cities join the race route roster: Greater Palm Springs and Murrieta will host Stage 2, which will include an intense finish up the Palm Springs Aerial Tramway, one of the toughest climbs anywhere with an 1,880-foot elevation gain in the last four miles. Two other firsts: Escondido and Santa Rosa will become the first cities in race history to have hosted both an overall start and an overall finish.
“We take great pride in creating challenging, beautiful Amgen Tour of California routes that attract top international riders and showcase the state’s amazing terrain and scenery,” said Kristin Bachochin, executive director of the race and senior vice president of AEG Sports. “We also consider the many fan and rider route suggestions before we settle on a final course. This year will be not only the most competitive but the most spectacular with diverse California scenery, from coastal routes to mountain vistas.”
As one of the most anticipated professional cycling races on the international calendar, the Amgen Tour of California draws top cyclists from the ranks of Olympic medalists, Tour de France competitors and world champions including BMC Racing Team’s current world road champion Philippe Gilbert.
The 2013 Amgen Tour of California will feature the following highlights*:
Stage 1, Presented by Nissan: Sunday, May 12 – Escondido
Start/Finish Location: Broadway and Grand Ave.
Start Time: 11:15 a.m.
Stage Length: 104.3 miles
Expect huge crowds as the Amgen Tour of California returns to San Diego County for the first time since 2009, when record numbers greeted the tour along the course and at the start and finish cities of Rancho Bernardo and Escondido. The 2013 route will include a climb up Mount Palomar, an effort that is often compared to the arduous Alpe d’Huez at the Tour de France.
Stage 2, Presented by Visit California: Monday, May 13 – Murrieta to Greater Palm Springs
Start Location: Murrieta City Hall/Town Square Park
Finish Location: Palm Springs Aerial Tramway
Start Time: 10:20 a.m.
Stage Length: 126.1 miles
Well versed in staging cycling races, Murrieta has been the host city for the popular Tour of Murrieta for several years. Incorporating a new part of California into the race, this stage will wind south through Temecula Valley Wine Country. Then the riders will tackle the climb up the San Jacinto Mountains to the hamlet of Idyllwild, one of the country’s top mountain biking destinations, before descending into the Coachella Valley and the towns of Palm Desert, Rancho Mirage, Cathedral City and Palm Springs. The stage will finish spectacularly as riders climb Tramway Road to the Palm Springs Aerial Tramway parking lot. The last 3.8 miles of the race will gain 1,880 feet of elevation – one of the toughest climbs anywhere.
Stage 3: Tuesday, May 14 – Palmdale to Santa Clarita
Start Location: Marie Kerr Park
Finish Location: Magic Mountain Parkway
Start Time: 11:20 a.m.
Stage Length: 111.8 miles
The race will return to host cities Palmdale and Santa Clarita, but will traverse entirely new roads. The stage will feature the 22-mile climb up Lake Hughes Road and follow the route of the famous Furnace Creek 508, the ultra-endurance race through Santa Clarita. The peloton will likely break apart on the massive climb, but an 18-mile descent to the finish will give the riders a chance to regroup and mount a large field sprint toward the finish line.
Stage 4: Wednesday, May 15 – Santa Clarita to Santa Barbara
Start Location: Theater Drive and Town Center
Finish Location: Cabrillo Blvd.
Start Time: 12:35 p.m.
Stage Length: 84.7 miles
Veteran Amgen Tour of California racers will recognize this stage from past races, but they’ll be riding it in reverse. After the desert terrain of Stage 3, they’ll welcome ocean breezes as they descend to the finish in coastal Santa Barbara. They’ll have their work cut out for them: punishing headwinds are a regular feature along the route to Santa Paula, site of the first sprint of the stage. A sprint in Ojai will be preceded by the K.O.M. and technical descent of Dennison Grade. Past Ojai, the climb up Casitas Pass will give way to long downhill and flat finish along the beach in Santa Barbara. There is no question that this stage will favor the sprinters.
Stage 5, Presented by Visit California: Thursday, May 16 – Santa Barbara to Avila Beach
Start Location: Cabrillo Blvd.
Finish Location: Front St.
Start Time 11 a.m.
Stage Length: 116.4 miles
A start along the beach in Santa Barbara will see the race retrace much of its 2006 route, but in reverse order. The riders will continue over the steep and windy San Marcos Pass along state Route 154 before descending into the Lake Cachuma Recreation Area. The racers will then tackle Foxen Canyon Road outside of Los Olivos and pass through Orcutt and the quaint farm town of Guadalupe, which gave the race a warm welcome in 2006. A sprint in Arroyo Grande will foreshadow an anticipated massive sprint to the finish in Avila Beach, which offers a picturesque harbor, quaint shops, a beautiful beach and the opportunity for its 1,700 residents to join thousands of race fans to watch the peloton storm down Front Street in hopes of capturing the stage win.
Stage 6: Friday, May 17 – San Jose (Individual Time Trial)
Start Location: Bailey Ave.
Finish Location: Metcalf Road – Metcalf Motorcycle Park
Start Time: 12:50 p.m.
Stage Length: 19.6 miles
San Jose is a familiar setting for the race; it’s the only city to participate in all eight editions of the Amgen Tour of California. The race returns to the 2006 time trial course for the first three-fourths of the day, with the addition of a wicked stinger at this year’s finish. This 19.6-mile stage features a climb that begins soon after the riders push off the starting ramp. As the racers navigate around beautiful lakes and golf courses, they will begin to prepare for the most difficult finish posed by any Amgen Tour of California time trial course. Once they make the final right-hand turn on the route, they will face the strenuous, three kilometer climb up Metcalf Road to the finish. The riders will gain nearly 1,000 feet in elevation and attack several pitches with a grade of 10 percent or more.
Stage 7, Presented by Nissan: Saturday, May 18 – Livermore to Summit of Mount Diablo
Start Location: 3rd St./Carnegie Park
Finish Location: Mount Diablo – summit parking lot
Start Time: 11:35 a.m.
Stage Length: 93 miles
In all likelihood, the 2013 Amgen Tour of California will be won or lost on the climb to the peak of Mount Diablo. The 92-mile route features several cyclist favorites, including Morgan Territory Road, new to the race this year. The riders will navigate narrow, twisting climbs through bucolic farm country and redwoods before making a roller-coaster descent. The race will return to Patterson Pass Road where they will encounter the infamous “wall,” a short, steep climb toward the end of the road where riders will peddle up grades over 15 percent in the last two kilometers. The peloton will return to Livermore for a sprint, and finally, expect large crowds at Mount Diablo, which historically has attracted some of the largest audiences for a mountain race route. This year, the race will cover an additional 4.5 miles of climbing to the summit, perhaps the greatest viewscape of any mountain in California with breathtaking views up to 200 miles in any direction.
Stage 8, Presented by Amgen: Sunday, May 19 – San Francisco to Santa Rosa
Start Location: Marina Green
Finish Location: 3rd Street and Santa Rosa Ave.
Start Time: 8:15 a.m.
Stage Length: 86.2 miles
We could not have designed a better stage for the finish of 2013 Amgen Tour of California! This stage encompasses some of the most spectacular scenery as it winds through San Francisco, the Golden Gate Bridge, Sausalito, Highway 1, Point Reyes National Seashore, Occidental and Santa Rosa, where the crowds are expected to be the largest ever to see the race conclude. An early race start at Marina Green in San Francisco (dictated by live race coverage on NBC) and a rolling traffic break of the Golden Gate Bridge will ensure the spectacular sight of the peloton descending on the landmark. The bridge sidewalk will remain open to provide spectators the opportunity to cheer on the cyclists racing across the structure.
The race will be capped off by two spectator-friendly finish circuits in downtown Santa Rosa where the winner of the 2013 Amgen Tour of California will be crowned in a special awards ceremony. At the end of the race, the winner and the team who supported him will take top honors for having conquered the longest and most difficult stage race ever mounted in the United States.
Cycling fans can experience the excitement of America’s biggest professional stage race up close and personal by becoming a race volunteer. Race organizers are looking to fill nearly 5,000 volunteer positions. Registration and further information about the various duties available is now available online at www.AmgenTourofCalifornia.com.
For the last five years, title sponsor Amgen has recognized outstanding individuals making a difference for cancer patients and their loved ones in communities across California through the Breakaway from Cancer initiative, designed to raise awareness of the important resources that are available to those affected by cancer – from prevention through survivorship. Four individuals – one from each of the 2013 Amgen Tour of California communities of Escondido, Santa Clarita, Santa Barbara and Livermore – will ultimately be selected as the Breakaway from Cancer Champions. Nominations will be accepted online until Feb. 25 to recognize a cancer survivor, patient, caregiver or advocate for those impacted by cancer. Learn more about becoming a Breakaway from Cancer Champion at www.breakawayfromcancer.com/champions.
About the Amgen Tour of California
The largest cycling event in America, the 2013 Amgen Tour of California is a Tour de France-style cycling road race, created and presented by AEG, that challenges the world’s top professional cycling teams to compete along a demanding course from May 12-19, 2013. For more information, please visit www.AmgenTourofCalifornia.com.
About Amgen
Amgen discovers, develops, manufactures and delivers innovative human therapeutics. A biotechnology pioneer since 1980, Amgen was one of the first companies to realize the new science’s promise by bringing safe and effective medicines from lab, to manufacturing plant, to patient. Amgen therapeutics have changed the practice of medicine, helping millions of people around the world in the fight against cancer, kidney disease, rheumatoid arthritis, bone disease and other serious illnesses. With a deep and broad pipeline of potential new medicines, Amgen remains committed to advancing science to dramatically improve people’s lives. To learn more about our pioneering science and our vital medicines, visit www.amgen.com. Follow us on www.twitter.com/amgen.
About Breakaway from Cancer
Founded in 2005 by Amgen, Breakaway from Cancer is a national initiative to increase awareness of important resources available to people affected by cancer – from prevention through survivorship. Breakaway from Cancer is a collaboration between Amgen and four nonprofit partner organizations: Prevent Cancer Foundation, Cancer Support Community, Patient Advocate Foundation, and National Coalition for Cancer Survivorship. These organizations offer a broad range of support services complementing those provided by a patient’s team of healthcare professionals. For more information, please visit www.breakawayfromcancer.com or follow us @BreakawayCancer on Twitter and www.facebook.com/BreakawayfromCancer on Facebook.
About AEG
AEG is one of the leading sports and entertainment presenters in the world. AEG, a wholly owned subsidiary of The Anschutz Company, owns or controls a collection of companies including facilities such as STAPLES Center, The Home Depot Center, Sprint Center, The O2, Nokia Theatre L.A. LIVE and Best Buy Theater Times Square; sports franchises including the Los Angeles Kings (NHL), two Major League Soccer franchises, two hockey franchises operated in Europe, management of privately held shares of the Los Angeles Lakers, the Bay to Breakers foot race and the Amgen Tour of California cycling road race; AEG Live, the organization’s live-entertainment division, is a collection of companies dedicated to all aspects of live contemporary music performance, touring and a variety of programming and multi-media production. For more information, visit AEG today at www.aegworldwide.com.
*Route and start times are subject to change.
# # #
Media Contact:
Eileen Tanner, GolinHarris
213-438-8888
etanner@golinharris.com